WIKA LS-1000 Manual De Instrucciones página 7

Sonda de pozo
Idiomas disponibles

Idiomas disponibles

4. Mounting
4. Mounting
4.1 Mechanical mounting
Only use the instrument if it is in perfect condition with respect to safety.
Prior to commissioning, the instrument must be subjected to a visual inspection.
Leaking liquid is indicative of damage.
Obvious damage must be reported immediately.
4.2 Electrical mounting
Voltage supply
→ For auxiliary power, see product label
→ For further details on electrical mounting, see IN 00.50
This equipment is intended for operation with low voltages, which are separated from the AC 230 V (50 Hz) mains
voltage – or voltages greater than AC 50 V or DC 120 V for dry environments. A connection to an SELV circuit is
recommended, or alternatively to circuits with a different protective measure in accordance with IEC 60364-4-41
installation standard. The connection can also be made in line with "Class 2 Circuits" or "Class 2 Power Units" in
accordance with CEC (Canadian Electrical Code) or NEC (National Electrical Code).
For instruments with North American certification per UL/CSA IEC 61010-1:
The supply for the instrument must be made via a limited-energy circuit in accordance with section 9.4 of
UL/EN/IEC 61010-1 or LPS in accordance with UL/EN/IEC 60950-1/CSA C22.2 No.60950-1 or Class 2 in accordance
with UL1310/UL1585 (NEC or CEC). The voltage supply must be suitable for operation above 2,000 m should the
instrument be used at this altitude.
Shielding and grounding
The instrument must be grounded via the cable shield.
Pin assignment
→ For pin assignments, see product label
WIKA operating instructions submersible pressure sensor, model LS-1000
EN
7
loading