V-TAC SUN-5K-SG04LP3-EU Manual De Instrucciones página 41

Idiomas disponibles

Idiomas disponibles

Mode II: With Generator
Solar
Battery
Mode III: With Smart-Load
Solar
Battery
Mode IV: AC Couple
On-Grid+AC couple
Solar
Battery
The 1st priority power of the system is always the PV power, then 2nd and
3rd priority power will be the ba�ery bank or grid according to the se�ngs.
The last power backup will be the Generator if it is available.
7. Limita�on of Liability
In addi�on to the product warranty described above, the state and local laws and regula�ons
provide financial compensa�on for the product's power connec�on (including viola�on of implied
terms and warran�es). The company hereby declares that the terms and condi�ons of the
product and the policy cannot and can only legally exclude all liability within a limited scope.
AC cable
Backup Load
On-Grid Home Load
Generator
AC cable
Backup Load
On-Grid Home Load
Smart Load
AC cable
Backup Load
On-Grid Home Load
On-Grid Inverter
- 39 -
DC cable
Grid
DC cable
Grid
DC cable
Grid
loading

Productos relacionados para V-TAC SUN-5K-SG04LP3-EU