Watts Bradley S19-921 Instrucciones De Instalación página 2

Idiomas disponibles

Idiomas disponibles

S19-921
Read this installation manual completely to ensure proper installation, then file it
Installation
with the owner or maintenance department. Compliance and conformity to drain
requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
T H
E
S ID
until you obtain the missing parts.
U P
Test the unit for leaks and adequate water flow. The inspection and testing results of
this equipment should be recorded weekly to verify proper operation. This equipment
should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be
trained regarding the placement and proper operation of emergency equipment per
ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
For questions regarding the operation or installation of this product,
visit www.bradleycorp.com or call 1-800-BRADLEY.
Product warranties and parts information may also be found under "Products" on our
website at www.bradleycorp.com.
This unit is to be used with tepid, potable water as defined by ANSI Z358.1.
(Note: Avoid prolonged exposure to ambient heat sources above 100°F, or below 60°F).
100˚ F
60˚ F
2
IMPORTANT
1/3/2024
Bradley • 215-1546 Rev. U: ECO 23-05-022B
Installation
loading