Glacier bay HD873X-0810H Guía De Uso Y Mantenimiento página 10

Builders - grifo para tina y ducha con una sola función y una llave
Idiomas disponibles

Idiomas disponibles

Installation (continued)
6
Pressure testing and flushing
the installation
Make sure both stop valves (1) are fully open. If the stop valves (1) are closed, you must use athead
screwdriver to unscrew the valve rod in the stop valve (1) in a counterclockwise direction until the valve
rod can't be rotated.
Insert the test cap (P) into valve body (D). Slide the bonnet (2) over the test cap (P) and thread them onto the
valve body (D). Use plug (not included) to block the outlet of shower head, then turn on the hot and cold
water supply lines and check if there are any leaks on the outlet pipe/tube connections or elbows.
Remove the plug (3, not included), then turn on the hot and cold water supply lines and allow the water
to ow from the outlet for one minute or until all foreign matter has been ushed out.
Shut off the water supply lines. Remove the bonnet (2) and the test cap (P).
2
Clockwise
OFF
ON
Counter-Clockwise
3
P
1
D
10
D
1
3
loading