1 | MI_2130: Removal and installation of the gas blower (including gas valve) hot air and steam
Work steps - installation of the gas blower (including gas valve) hot air and
steam
1. Proceed in reverse order to install. For the installation, use the new com-
ponents provided.
The marked adjusting screws (1) and (2) may only be tightened with a
torque of 1.2Nm (+/- 0.1Nm).
Too high a torque will damage the valve.
2. Conduct a gas leak check after installation.
3. After the installation, carry out a leak test and flue gas analysis.
Note: Do not use leak detection spray when checking gas components for
leaks. The leak detection spray may damage adjacent components.
>>
Installation is complete.