ABB ACQ580-04-505A-4 Instrucciones De Instalacion Y Puesta En Marcha página 11

Ocultar thumbs Ver también para ACQ580-04-505A-4:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
1
4
Lifting the drive module
Lift the drive module only by the lifting lugs:
Measure the insulation resistance of the input and motor
cables and the motor
Before you connect the input power cable to the drive, measure its insulation resistance
according to local regulations.
Ground the motor cable shield at the motor end. For minimal interference, make a
360° grounding at the cable entry, or keep the pig tail short.
Measure the insulation resistance of the motor and motor cable when the motor cable
is disconnected from the drive. Measure the insulation resistance between each phase
conductor and the Protective Earth conductor using a measuring voltage of 1000 V DC.
The insulation resistance of an ABB motor must be greater than 100 Mohm (reference
EN – Quick installation and start-up instructions 11
Accessory box contents: Assembly kit
3AXD50000453900
2
1
Screw package, includes also
spacers for FSO module installation
2
Rubber grommets for control unit
cable entry holes in the middle front
3
cover of the drive module
3
Fastener for Rittal VX25 enclosure
4
Bracket for attaching the drive
module from top
(3AUA0000096082). The bracket
brings a gap for cooling air flow and
prevents the drive module screws
5
from chafing the plate.
5
Cardboard box
3AXD50000453894
EN
DA
DE
ES
FI
FR
IT
NL
PL
PT
SV
TR
ZH
loading