Kenmore 580.75251 Manual Del Propietário página 5

Acondicionador de aire de ventana
Ocultar thumbs Ver también para 580.75251:
Idiomas disponibles

Idiomas disponibles

INSTALLATION REQUIREMENTS
Your air conditioner will install into standard double
hung windows with actual clear opening widths of
29 to 41 inches (737mm to 1041mm) (FIG. 1)
Lower sash must open sufficiently to albw a clear
vertical opening of 19 inches (483mm). Side louvers
and the rear of the air conditioner must have clear
air space to allow enough airflow through the
_ndenser
for heat removal. The rear of the unit
must be outdoors, not inside a buiiding or garage.
19" rain.
Inner
Interior wall
Exterior
FIG, 1
ELECTRICAL
SERVICE
Check your available electrical service. The power
supply available must be the same as that shown on
the unit n_eplate
(found on right: side of cabinet).
AH mode_s are equipped
with a 3-prong
service
plug
to provide proper service and safe positive
grounding_
Do not change
plug in any way, Do not
use an adapter plug. If your present wall outlet does
not match your plug, call a qualified
electrician
to
make the necessary
corrections.
SAVE CARTON
and this OWNER'S
MANUAL
for
future reference.
The carton is the best way to store
unit during winter or when not in use.
To avoid risk of personal injury, property damage,
or product damage due to the weight of this
device and sharp edges that may be exposed:
• Air _nditioners
covered in this manual pose an
excessive weight hazard. Two or more people
are ne_ed to move and install the unit.
To prevent injury or strain, use proper li_ing and
carrying techniques when moving unit.
• Carefully inspect location where air _nditioner
will be installS. Be sure it will support the
weight of the unit over an extended peri_ of
time.
• Handle air _nditioner
with care. Wear
protective gloves whenever lifting or car_ing the
unit. AVOID the sharp metal fins of front and
rear coils.
• Make sure air conditioner does not fali during
installation.
INSTALLATION
HARDWARE
A
B
C
D
E
N
F
G
H
I
J
K
FIG. 2
ITEM
NAME OF PARTS
Q'TY
A
SIDE CURTAIN
2
B
SUPPORT BRACKET
2
C
SILL BRACKET
2
D
LOCK NUT
4
E
SCREW: 25/64"
11
F
SCREW: 13/16"
7
G
SCREW: 9/16"
5
H
M-SCREW
2
I
CARRIAGE BOLT
2
J
FOAM SEAL
1
K
FOAM STRIP
1
L
WINDOW LOCKINGBRACKET
1
M
DRAIN PiPE
1
N
WASHER
1
REQUIRED TOOLS:
• Tight Fi_ing gloves
• Standard screwdriver
• Phillips screwdriver
• Pliers
• Sharp knife
° 3/8-inch o_n end wrench or adjustable wrench
• 1/4-inch hex socket and ratchet
• Tape measure
° Electric drill
° 1/4-inch drill bit
-5-
loading