Tuthill FILL-RITE 900CD Manual De Instalación, Operación Y Seguridad Del Propietario página 3

Medidor digital de líquido
Idiomas disponibles

Idiomas disponibles

Safety Information
WARNING! To insure safe and proper operation of your equipment, it is critical to
read and adhere to all of the following safety warnings and precautions. Improper
installation or use of this product can cause serious bodily injury or death!
1)
NEVER smoke near the meter, or use the meter near open flames when
metering a flammable liquid! Fire can result!
A "Fill-Rite" Filter should be used on the meter outlet to insure no foreign
2)
material is transferred to the fuel tank.
3)
Threaded pipe joints and connections should be sealed with the appropriate
sealant or sealant tape to minimize the possibility of leaks.
4)
Storage tanks should be securely anchored to prevent shifting or tipping
when full or empty.
5)
To minimize static electricity build up, use only static wire conductive hose
when metering flammable fluids, and keep the fill nozzle in contact with the
container being filled during the filling process.
6)
DO NOT exceed 50 psi/ 3.5 BARS line pressure.
7)
DO NOT install additional foot valve or check valve without a pressure relief
valve; otherwise the meter may rupture.
WARNING! This product shall not be used to transfer fluids into any type of
aircraft.
WARNING! This product is not suited for use with fluids intended for human or
animal consumption or fluids containing water. Nickel plated meters are approved
for use with non-potable water, antifreeze, certain agricultural chemicals, and
other specialized water applications.
Installation
Meters are furnished for horizontal piping with left to right
flow (facing the front of the meter). The display can be
rotated to any of four positions for horizontal or vertical
piping and for either direction of flow.
1.
Determine direction for fluid to flow.
2.
Install meter observing directional arrow on casting
on back of meter (circled). Liquid MUST flow in the
direction of the arrow for proper operation.
3.
Once the meter is plumbed into place, remove
four screws (circled) on corners of meter face
(Torx T25 bit required).
4.
Rotate meter face assembly to desired
orientation.
5.
Replace four screws.
6.
Complete installation by making sure the joints
are properly sealed and meter is positioned for
easy viewing and use.
CAUTION! Threaded pipe joints and connections should be sealed with the
appropriate sealant or sealant tape to prevent the possibility of leaks.
3
Flow Direction
loading