7
Hose runs through holes in
extensions, then through
7
holes in overhead.
3
Passenger
Side
cylinder on left column.
Cylinder bleeders
5
15 ft. lbs. Minimum
20 ft. lbs. Maximum
4
1
2
6
12. Equalizer Cables: Fig. 15 describes general cable ar-
rangements. It is easier to tie-off lower (short) cable
studs first. Notice, long cable studs must be located on
top, Fig. 14.
A) Run cable stud up through the lower tie-off plate, and/
or bracket(s), and/or spacer(s) depending on the lift
model, Fig. 15.
B) Push cable up until stud is above top of carriage Fig.
15.
Fig. 14
Hose runs down
approach side to
Torque values
Fig. 13
2nd Cable
7
ITEM
QTY.
1
2
7
2
1
3
1
4
1
5
3
5
3
6
1
6
1
7
4
5
7
4
7
4
5
C) Run nylon insert locknut onto studs so that 1/2" ex-
tends out from locknut Fig. 15.
D) Pull cables back down through carriage Fig. 15.
E) Run cable overhead and tie-off top (long) cable studs
and torque to about 100 in-lbs., see Fig. 14 & Fig. 15.
Upper Sheaves
Long Cable Threads
Located on Top
Lower Sheaves
12
DESCRIPTION
Hydraulic Cylinder
Power Unit Hose
Overhead Hose
Branch Tee
Hose Clips(5/8")
5/16"-18NC x 3/8" lg. PHMS
Hose Clips(5/8")
5/16"-18NC x 3/8" lg. PHMS
Hose Clips(5/8")
5/16"-18NC x 5/8" lg. PHMS
5/16"-18NC Nut
1st Cable