Diamond TPS3B/L Manual De Instrucciones página 28

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 60
8.2.
Installation
All the installation phases must be considered,
from the moment of creation of the general plan.
The installation area must be equipped with all
power supply and production residue drainage
connections and must be suitably lit and respect
current laws regarding hygiene and sanitary
requirements.
To optimise consumption and reduce wear of the
machine, do not position it in the vicinity of heat
sources or in environments where temperatures
are too high.
Proceed with machine levelling, adjusting the
individual feet.
!
This appliance can only be installed and
operate
in
rooms
which
ventilated, in order to guarantee correct operation.
Connect and leave for a certain period of
time
(at
least
2
hours)
functioning. During transport it is probable that the
compressor
lubricant
refrigerant circuit blocking the capillary: as a
consequence the appliance will function for a
certain period of time without producing cold until
the oil has returned to the
are
permanently
before
checking
oil
has
entered
the
compressor.
!
ATTENTION: the appliance requires the
minimum functioning spaces as shown in the
diagram.
ATTENTION !!
the appliance requires the minimum
functioning spaces as shown in the
11
ENGLISH
!
di
GB
loading