CAME ZA4N Manual De Instalación página 13

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42
4.1 Main components
1 - Connection terminal boards
2 - Line fuse 5A
3 - Control unit fuse 1A
4 - Radio-code save buttons
5 - Trimmer TL: Operating time adjustment
6 - Trimmer delay on closing cycle motor n°2
adjustment
7 - Trimmer TCA: Automatic closing time
adjustment
8 - 2-dip function switch (see pag.6)
9 - Socket AF radiofrequency board (see table)
10 - Signaling LED
11 - Motor torque regulator
N.B. FROG series: connect the black wires coming
out of the board to the connectors of the fi rst motor's
condenser and the red wires to the second motor's
condenser.
Warning! Before acting on the machinery,
cut off the main power supply.
5 Installation
5.1 Preliminary checks
Before installing, do the following:
• Check that the panel's anchoring point is protected from possible blows, and that the anchoring surface is solid. Also check that the
anchoring is done using the appropriate bolts, screws etc.
• Make sure you have a suitable omnipolar cut-off device with contacts more than 3 mm apart, and independent (sectioned off) power
supply.
Make sure that any connections inside the case (that provide continuance to the protective circuit) be fitted with extra insulation
as compared to the other conductive parts inside.
• Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical
damage.
5.2 Tools and materials
Make sure you have all the tools and materials you will need for the installation at hand to work in total safety and compliance with the
current standards and regulations.
11
L2T
1
2
3
4
L1T
0 12 24
L1 L2 C
0
12
24
FUSIBILE CENTRALINA 1A
3
FUSIBILI LINEA 5A
2
L1 L2
U V W X Y E1
1
10
5
6
7
T.C .A.
T.L.
TR2M.
4
1 2
QUADRO C OMANDO
ZA4
2 3
10 11 1
5 7 C1
8
9
loading