ENGLISH
nuts under the gearmotor base by approximately 2mm, and then securing
the four upper nuts. Make sure that the rack and pinion are aligned and
centred (fig.10).
WARNING - Remember that the rack and pinion life strictly depends
on their correct meshing.
9) ELECTROMECHANICAL LIMITING DEVICES
The operation must be carried out with the emergency release activated and
the mains power supply disconnected. The runners which control the limiting
devices are to be positioned at both ends of the rack.
- Push the gate fully open by hand.
- Position the opening end-of-stroke runner (fig.11) so that it intercepts the
microswitch control lever and makes it trigger. Having identified the correct
position, tighten the runner screws.
- Push the gate fully closed by hand.
- Position the closing end-of-stroke runner (fig.11) so that it intercepts the
microswitch control lever and makes it trigger. Having identified the correct
position, tighten the runner screws.
- The runners must lock the gate before this intercepts the mechanical
backstops placed on the track. The closing end-of-stroke runner adjustment
must be made in such a way as to leave a clearance of approximately
50mm between the gate and the fixed swing leaf, as prescribed by the
current safety standards, otherwise fit an electric edge at least 50mm
thick (fig.12).
10) GATE BACKSTOPS
DANGER - The gate must be provided with mechanical backstops, both
on opening and closing, in order prevent it from coming out of the upper
guide (fig.13); the backstops must be tightly secured to the ground, a
few centimetres beyond the electrical stop point.
11) ELECTRICAL INSTALLATION SETUP
Lay out the electrical installation as shown in fig.14 with reference to the CEI
64-8 and IEC364 provisions complying with the HD384 and other national
standards in force for electrical installation.
WARNING! For connection to the mains, use a multipolar cable having
a minimum cross section of 3x1.5 mm
standards. (For example, if the cable is not protected, it must be at least
equal to H07 RN-F, whereas if it is protected it must be at least equal
to H07 VV-F with a 3x1.5 sq mm
Connect the control and safety devices in compliance with the previously
mentioned technical installation standards. The cables (mains and auxiliary)
must be distinctly separated. Fig.14 shows the number of connections and
their cross sections for a length of approximately 100 metres; for greater
lengths, calculate the cross section for the true automation load.
The main automation components are (fig.14):
I
Type-approved adequately rated omnipolar circuit-breaker with at
least 3,5 mm contact opening, provided with protection against
overloads and short circuits, suitable for cutting out automation
from the mains. If not already install ed, place a type-approved
omnipolar circuit-breaker with a 0.03A threshold just before the
automation system.
QR
Control panel with built-in receiver
S
Key selector.
AL
Blinker with tuned antenna.
M
Actuator
Fte, Fre Pair of external photocells.
T
1-2-4 channel transmitter.
C
Sliding rack.
12) TERMINAL CONNECTIONS
After adequate electric cables have been made to pass through the race-
ways and the various automation components fixed to the chosen points,
these must be connected according to the instructions and diagrams shown
in the relevant instruction manuals. Connect the phase, neutral and earth
(compulsory) cables. The power supply cable must have double insulation,
and must be stripped by as little as necessary to be connected to the JP1
terminal bar. The mains cable is to be secured in the appropriate cable clamp
(fig.15- ref. P1), the accessory cables in their cable clamp (fig.15- ref. P2),
and the protection (earth) wire, having a yellow/green insulating sheath, must
be held in its appropriate wire clamp (fig.15 - ref. S).
The automation device is to be set at work after all the safety devices have
been connected and checked. See the terminal diagram in fig.16.
1-2
Receiver radio board antenna input (1 braid, 2 signal)*
3-4
24 V~ 200mA max. output
5-6
Motor connection.
7-9
SWO opening limit switch (7 red - 9 black, common)
8-9
SWC closing limit switch (8 brown - 9 black, common)
10-11
Gate open warning light output (N.O. contact (24V~/1A max)) or, as
an alternative, 2° radio channel (see paragraph 9 "configuration").
12-13
FAST NET terminals
18 -
DEIMOS BT - NETTUNO S-MA - Ver. 04
INSTALLATION MANUAL
and complying with the current
2
cross section).
2
14-15
FAST NET terminals
16-17
Secondary for transformer
18-19
Single-phase mains power supply 230V~ ±10% (18=L) (19=N)
20-21
Primary for 230 V~ transfomer
* only with radio module fitted.
13) CONNECTION OF FAST NET DEVICES
The FAST NET devices are powered by a non-polarised paired wire.
Warning: to connect the FAST NET devices, it is advisable to use the
appropriate FAST WIRE cable.
must not exceed 200 m.
Connect the cable to the FAST NET terminals.
terminals are supplied to facilitate installation of a large number of devices.
To connect a large number of FAST NET devices, it is possible to connect a
part of them between terminals 12-13 and the rest between terminals 14-15.
Having completed the initial checks, configure the Fast Net network;
the configuration procedure for the devices is described in paragraph
15.6 «FAST NET configuration».The FAST NET configuration for the
identification of the connected devices should be repeated every time
the connected devices are changed (e.g. by adding or eliminating
some of them).
14) PROGRAMMING
The control panel provided with a microprocessor is supplied with function
parameters preset by the manufacturer, suitable for standard installations. The
predefined parameters can be altered by means of either the incorporated
display programmer or
universal palmtop
In the case where programming is carried out by means of
programmer, carefully read the instructions relating to
programmer, and proceed in the following way.
Connect the
Universal palmtop programmer
UNIFLAT and UNIDA accessories (See fig. 17). The NETTUNO S control
unit does not supply the Universal palmtop programmer with power, and
therefore requires an appropriate supply unit.
Enter the "CONTROL UNITS" menu, and the "PARAMETERS" submenu, then
scroll the display screenfuls using the up/down arrows to set the numerical
values of the parameters listed below.
For the function logics, refer to the "LOGIC" submenu.
In the case where programming is carried out by means of the incorporated
programmer, refer to Fig. A and B and to the paragraph on "Configuration".
N.B.: The NETTUNO S control unit cannot supply the
programmer
with power.
15) CONFIGURATION
The display programmer is used to set all the NETTUNO S control panel
functions.
The programmer is provided with three pushbuttons for menu scrolling and
function parameter configuration:
+
menu scrolling/value increment key
-
menu scrolling/value reduction key
OK
Enter (confirm) key
The simultaneous pressure of the + and - keys is used to exit the active
menu and move to the preceding menu.
The modifications made are only set if the OK key is subsequently
pressed.
When the OK key is pressed for the first time, the programming mode is
entered.
The following pieces of information appear on the display at first:
-
Control unit software version
-
Number of total manoeuvres carried out (the value is expressed in
hundreds, therefore the display constantly shows 0000 during the first
hundred manoeuvres)
-
Number of manoeuvres carried out since the latest maintenance opera-
tion (the value is expressed in hundreds, therefore the display constantly
shows 0000 during the first hundred manoeuvres)
-
Number of memorised radio control devices.
When the OK key is pressed during the initial presentation phase, the first
menu can be accessed directly.
Here follows a list of the main menus and the respective submenus available.
The predefined parameter is shown between square brackets [ 0 ].
The writing appearing on the display is indicated between round brackets.
Refer to Figures A and B for the configuration procedure.
15.1) Parameters menu
-
Automatic Closing Time (TCA) [ 10s ]
Set the numerical value of the automatic closing time from 3 to 120 seconds.
-
Opening Motor torque (op. t) [ 80% ]
Set the numerical value of the motor torque between 1% and 99%.
-
Closing Motor torque (cls. t) [ 80% ]
Set the numerical value of the motor torque between 1% and 99%.
-
Slow-down opening motor torque (op. t slow) [ 50% ]
(Advanced parameters ⇒ address 8)
Set the numerical value of the motor torque between 1% and 99%.
The maximum total length of the network
Two pairs of FAST NET
programmer.
universal palmtop
universal palmtop
to the control unit through the
Universal palmtop