Hayward WFBRNDBRS Manual Del Propietário página 6

Receptáculo de agua, efecto de agua con iluminación led
Idiomas disponibles

Idiomas disponibles

Plumbing
Before installing the Water Bowl, rough-in plumbing pipe and electrical conduit. Refer to the diagram
below for niche dimensions.
Step 1: Rough-in water supply line (A) plumbing run using 11/2" Schedule 40 PVC pipe.
Step 2: Rough-in drain line (B) plumbing run using 1" Schedule 40 PVC pipe.
Step 3: Rough-in electrical line (C) plumbing run using 1" Schedule 40 PVC pipe.
Step 4: Solvent bond niche to the water line, drain line, and electrical line pipes using PVC glue.
Step 5: Backfill the cavity around the niche up to the flange as shown in the diagram below.
Finish material
should be flush with
top of niche flange
Finish Material
Earth
Step 6: Finish plumbing water line, electrical line, and drain line as shown in the overview diagram
on page 3.
5
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
11.10"
B
A
3.00"
2.50"
5.30"
C
Finish Material
Earth
loading