Maintenance schedule
WARNING
Always immobilise the machine by stopping the engine, removing the ignition key and
disconnecting the battery before undertaking any maintenance work.
Maintenance schedule
Check engine oil - top up if necessary
(10W-30).
Check for engine oil / hydraulic oil
leaks.
Check fuel level.
Check feed funnel, feed roller cover,
access covers, engine covers and
discharge unit are securely fitted.
Check blades
Ensure engine air intake is free from
leaf build up.
Check tyre pressure is 2.2 Bar (32
psi).
Check safety bar mechanism.
Grease the roller box slides.
Grease the roller spline and bearing.
Clean air filter element.
Check for tightness all nuts, bolts
and fastenings making sure nothing
has worked loose.
Grease discharge flange.
Check tension of main drive belts
(and tension if necessary).
Check anvils for wear.
Check fuel pipes and clamp bands.
Check battery electrolyte level.
Daily Check 50 Hours
DEPENDING ON WORKING ENVIRONMENT
100 Hours
500 Hours
OR AS REQUIRED
OR AS REQUIRED
1 Year