Apex Domus 2+ Manual De Instrucciones página 10

Ocultar thumbs Ver también para Domus 2+:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
Domus 2+ / English
4. Plug the power cord into electrical outlet.
NOTE- 1. Make sure the pump unit
2. The plug is also served as the dis-
CAUTION-
5. Then turn the main power switch to ON position which
located on the display panel.
is suitable for the local
power voltage.
connect device. Do not position the
equipment so that it is difficult to
operate the disconnecting device.
The pump can only be applied to
the mattress recommended by the
manufacturer. Do not use it for
any other purpose. (applied part:
air mattress)
7
loading

Productos relacionados para Apex Domus 2+