Visual Signage; Installation; Preparation; Installation Procedure - S&P BR 25 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

22.3.3. Visual signage

Startup
Power up
Status
OK
Low battery
Dirty fi lter
Fan error
Esito interazione
Mode changed
Binding succeeded
Communication error

22.4. INSTALLATION

22.4.1. Preparation

NOTE: Do not place the device in a metal casing.
Si puede colocarlo en una caja empotrada en la pared, prepare la pared:
1. Pull the buttons from the
unit.
3. If using screws: prepare the wall, if needed. Use the mounting plate as a template.
4. If using tape:
a. Remove the foil from the double-sided tape.
b. Make sure that the surface is fl at & clean.

22.4.2. Installation procedure

1. Place device / mounting
plate.
2. If using screws: fasten the
mounting plate using the
screws.
46
Orange
Green
Orange
Red
Green
Red
2. Loosen the clips and separate the unit from the
mounting plate.
3. Place the device onto the
mounting plate.
Status LED
1 fl ash
1 fl ash
2 fl ashes
1 fl ash
1 fl ash
2 fl ashes
1 fl ash
4. Place the buttons.
Tabla de contenido
loading

Este manual también es adecuado para:

Br 25 plusBr 25 plus e

Tabla de contenido