Fulgor Milano CPH 401 BQ X Instalación, Uso, Mantenimiento página 9

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
Installation
These instructions are provided for qualified installers as
a guide to installation, adjustment and maintenance in
conformity with current laws and standards. Service must
always be performed with the appliance disconnected
from the electricity.
Positioning (Fig. 2 and 3)
The appliance is designed to be built in to a work surface
as shown in the figure. Prepare the edge of the hob with
the sealant provided (Fig. 5).
Electrical connection
Before connecting to the electricity, make sure that:
- the characteristics of the system match the data on
the bottom of the hob;
- the system has an effective earth connection
compliant with current standards and laws. An earth
connection is required by law.
- If the appliance has no cable and/or plug, use
material suitable for the absorption indicated on the
registration plate and for the working temperature.
The cable must not reach a temperature higher than
50 °C above room temperature in any point.
- For direct connection to the mains, it is necessary
to provide a device that ensures disconnection from
the mains, with an open distance of the contacts that
allows complete disconnection under Category III
conditions, conforming to the installation rules.
- The omnipolar plug or switch must be easy to reach
when the appliance is installed.
- The appliance is NOT intended for use with an
external timer or a separate remote control system.
- If it is necessary to replace the power cord of the fryer,
use only an oil-resistant type H05RN-F or H07RN-F
cable.
- If it is necessary to replace the power cord of the
barbecue, use an H05RR-F type cable or equivalent.
Note: The manufacturer declines all liability if the
usual accident prevention standards and the above
instructions are not followed.
To avoid all risk, if the power cable becomes
damaged, it must only be replaced by the
manufacturer, by an authorised service centre, or by
a qualified electrician.
9
GB
loading