Mitsubishi Electric MXZ-2C20NA4-U1 Manual De Instalación página 7

Idiomas disponibles

Idiomas disponibles

4-2. GAS CHARGE
Perform gas charge to unit.
1) Connect gas cylinder to the service port of stop valve.
2) Perform air purge of the pipe (or hose) coming from refrigerant gas cylinder.
3) Replenish specified amount of the refrigerant, while operating the air conditioner for cooling.
Note:
In case of adding refrigerant, comply with the quantity specified for the refrigerating cycle.
CAUTION:
When charging the refrigerant system with additional refrigerant, be sure to use liquid refrigerant.
Adding gas refrigerant may change the composition of the refrigerant in the system and affect
normal operation of the air conditioner. Also, charge the liquid refrigerant slowly, otherwise the
compressor will be locked.
To maintain the high pressure of the gas cylinder, warm the gas cylinder with warm water (under
104°F (40°C)) during cold season. But never use naked fire or steam.
4-3. REMOVING THE MAINTENANCE PANEL
The setting of Dip Switch on the outdoor controller board can be changed
without removing the front panel.
Follow the procedures below to remove the maintenance panel and set
the Dip Switch.
1) Remove screw(s) which fix the maintenance panel.
2) Remove the maintenance panel, and perform necessary settings.
3) Install the maintenance panel.
Note:
Make sure to fix the maintenance panel securely. Incomplete installation
could cause malfunction.
Model
MXZ-2C20NA2
Stop valve
Union
Union
Indoor
unit
Union
Stop valve with
service port
Union
Refrigerant gas
cylinder
operating valve
Gauge manifold
(for R410A)
valve (for R410A)
Refrigerant gas cylinder for R410A with siphon
Refrigerant (liquid)
Electronic scale for refrigerant charging
Maintenance panel
Indoor unit
A – B
Liquid
pipe
Outdoor
unit
Gas
pipe
Charge hose
(for R410A)
En-6
loading

Este manual también es adecuado para:

Mxz-2c20na2Mxz-2c20na2-u1