Startup Procedure - Schulz FSB 13P Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FIGURE 8.19

9. STARTUP PROCEDURE

IMPORTANT
manufacturer for correct selection.
After finishing the steps related to the drill placement and assembly, and installation of the electrical network
(performed by the client), do the following procedures:
1. Consult the instructions contained in this manual for the correct selection of the drill's diameter, according
to the material do be drilled. See Table 8.2 and 8.3. For drilling 10mm or larger diameter holes, a guide hole
is recommended.
2. Connect the plug to the power outlet according to the voltage indicated on the drill.
3. Turn on the start switch 10, and observe the direction of the rotation, which is clockwise.
4. Check if the chuck 17 (that comes with the machine) and the drill bit (not supplied) are properly aligned.
5. Your drill is ready for use
IMPORTANT
it in three possible positions.
There is one type of drill bit for each type of material to be bored. Consult the drill bits'
Never hit the chuck. For a good tightening of the drill bit, use the chuck key to tighten
FIGURE 8.20
57
Adjustment shaft
Switch
FIGURE 8.21
Tabla de contenido
loading

Este manual también es adecuado para:

Fb 13Fsb 16pFb 16Fsb 16 tork

Tabla de contenido