Step 7 - Make Electrical Connection; Step 8 - Install Vent Covers - Haier HCH2100ACS Instrucciones De Instalación Y Manual Del Usuario

Campana de cocina de montaje mural de 24", 30" y 36"
Ocultar thumbs Ver también para HCH2100ACS:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

STEP 7 - MAKE ELECTRICAL CONNECTION

Plug into a grounded 3 prong outlet.
Do not remove the ground prong from the power cord plug.
Do not use an adapter.
Do not use an extension cord.
Failure to do so can result in death, re or electrical shock.
1. Plug into a grounded 3 prong outlet.

STEP 8 - INSTALL VENT COVERS

NOTE: Remove the white film from the vent covers, as needed, prior to assembly
and installation. Handle the vent covers gently to avoid scratching the finish.
1. When using both upper and lower vent covers, push lower cover down onto hood
and lift upper cover to ceiling and install with two 4 x 8 mm screws (provided).
NOTE: For vented installations, the upper vent cover may be reversed to hide
slots.
a
b
c
d
2. Using two screws (provided) fasten the bottom of the duct to the hood.
WARNING
Electrical Shock Hazard
a
4 x 8 mm Screw
b
Slots
c
Upper Vent Cover
d
Lower Vent Cover
13
Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hch3100acsHch6100acs

Tabla de contenido