Complete The Installation - Kohler K-5401-0 Guia De Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Caulk the base
of the toilet.

9. Complete the Installation

IMPORTANT! Do not install the access covers until the caulk has cured.
Caulk around the base of toilet. Do not caulk the area where the access covers meet the floor.
Attach the access covers.
Confirm correct seat operation using the seat functions outlined in the Homeowners Guide.
1226974-2-E
Attach both
access covers.
12
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-5401

Tabla de contenido