GreenWorks Pro ULTRAPOWER 60V BL60L01 Manual Del Operador página 7

Idiomas disponibles

Idiomas disponibles

10.2
INSTALL THE BLOWER TUBE
1. Move the tube until the tube release button engages into
the slot.
2. Connect the nozzle to the tube until the the tube locks
into the nozzle.
You can use the nozzle to increase airflow in tight areas.
10.3
INSTALL THE BATTERY PACK
WARNING
If the battery pack or charger is damaged, replace the
battery pack or the charger.
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
English
TIP
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
10.4
REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
10.5
ATTACH THE SHOULDER STRAP
1. Hook the strap to the strap connection.
2. Put on the shoulder strap.
3. Adjust the length of the strap to a comfortable position.
11
OPERATION
WARNING
Make sure the blower tube is in position before operation.
11.1
START THE MACHINE
1. Pull the trigger (1) to start the machine.
2. Pull the trigger fully to increase the speed.
7
EN
loading

Este manual también es adecuado para:

Ultrapower 60v bl60l25