Waeco ASC 5500G RPA Instrucciones De Uso página 114

Idiomas disponibles
  • ES

Idiomas disponibles

Operation
8.7.4
Selecting connections
1. Select the parameters in accordance with the air conditioning system
connections:
– Air conditioning system has a high pressure and a low pressure
connection:
Select LP/HP.
– Air conditioning system only has a high pressure connection:
Select HP.
– Air conditioning system only has a low pressure connection:
Select LP.
2. Press ENTER to confirm.
3. Once all settings have been entered, press ENTER to start the
process.
8.7.5
After ending the air conditioning service
✓ After the air conditioning service has finished, you are prompted to
disconnect the hoses of the AirConServiceCenter from the vehicle air
conditioning system.
1. Disconnect the service hoses (13) and (14) and press ENTER to
confirm.
✓ The service hoses will now be drained. The unit is then ready for
further use.
2. Screw the valve caps of the air conditioning system back on the
connections.
114
HP/LP
PORT
HP
PORT
LP
PORT
ENTER-OK STOP-EXIT
Process start?
ENTER-OK STOP-EXIT
ASC5500G RPA
EN
loading