Atlas Copco LLA250 ATEX Instrucciones Del Producto página 11

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 81
LLA250 ATEX
Installation instructions
Installation check list
Before the installation make sure that:
• The support for the hoist has sufficient strength for the combined maximum
load capacity plus hoist weight.
• Both straps of the chain collector are properly tightened.
• The chain is not twisted or entangled.
Installing the hoist
1. Hang the hoist securely on the intended support.
2. Connect the air supply.
3. If required, attach the optional control handle according to its instruction.
4. Lubricate the chain according to instructions below.
A)
Spray the chain with lubricant.
Lower the chain using the chain control.
B)
Continue until the entire chain is lubricated.
C)
EN
© Atlas Copco Industrial Technique AB - 9836 9833 00
Installation
11
loading

Este manual también es adecuado para:

8451154010