Connection Diagram - BADU OmniTronic Serie Traducción De Las Instrucciones Para El Manejo Originales

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 322
Installation
5.3.3

Connection diagram

Sensor 3
GND
Sensor 2
Level sensor
(optional)
BADU Eco VS or
BADU Eco Touch-Pro
control cable
ground, rd, br, gr, wh
Tone signal volume
Fig. 7
To connect the cables, first pull the plug off the pin header
upwards. The wires with press-fit wire end ferrules can therefore
be inserted conveniently under the orange opening points without
tools.
The tone signal can be set quieter and louder by replugging the
plugged bridge underneath the connections for the VS-pump. The
plugged bridge can also be removed if necessary. The tone signal
is then no longer available.
44 EN
3 digital inputs with 230 V
N, AC1, AC2, AC3
(PE distributor terminal
present)
3 potential-free digital inputs
DNG, DCx
2 relay outputs
Z1, Z2, Z_, 11, 14, 12
Pump (max. 4 A) with
asynchronous motor
Lp, Np
Supply
L, L, N, N
WG27.50.118-2-P
03|2022
Tabla de contenido
loading

Productos relacionados para BADU OmniTronic Serie

Este manual también es adecuado para:

Omnitronic r41Omnitronic r51

Tabla de contenido