Installation

5.1

Installation site

5.1.1
Installation
The installation site of the control must be dry and clean.
Installation outdoors is not permitted.
The control should be installed horizontally. Other installation
positions are not intended and must be cleared by the
manufactorer.
5.1.2

Temperature differences

Adverse effects (e.g. condensation) can occur if cold water is
pumped in a warm installation site.
Avoid greater temperature differences in the environment of
the backwash valve.
5.1.3

There must be ground drainage

Calculate the size of the ground drain according to the
following criteria:
Size of the swimming pool.
Circulation flow rate.
5.1.4

Ventilation and aeration

Ensure sufficient ventilation and aeration. The ventilation and
aeration must ensure the following conditions:
Prevention of condensation.
Limitation of the ambient temperature to maximum 40 °C.
5.1.5

Reserve space

Measure reserve space so that the upper part of the
BADU OmniTronic can be removed and the clock can be set
without any trouble. Observe a removal height of 200 mm.
5.1.6

Cable laying/line laying

Voltage potentials must be separated as shown in the
following drawing.
Use line/cable laying as shown in the following drawing.
03|2022
Installation
EN 39