Gaggia E90 Evolution Uso Y Mantenimiento página 68

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 142
English
Replace the lid and shift lever C3 from right to left and
allow the salted water to drain out of pipe F3 until the
water is fresh.
Shift lever D3 from right to left.
8.4
Non-scheduled maintenance
Unscheduled maintenance includes every repairing or part
replacing.
The Maintenance Technician is the only person authorized
to perform these operations.
68
loading

Este manual también es adecuado para:

D90 evolutionLcD