receptacle. Use the washer and lock nut on the outer side to secure the assembly
(see the Fig. below, item BB). Connect the steam condensing core (6) to the inner
core of the condensing cooling tower (DD). Release the threaded union coupling (9)
to facilitate this step. Mount the nut with the locking end on the steam
condensation core. Secure by tightening the threaded union. Repeat to install the
coupling for the inner core of the condensing cooling column.
Place the assembled condensing cooling tower (4) on the platform (11).
Attach the levelling shims (13) to the secondary sieve bottom (12). Place the
assembly on the kettle (1).
3.3. Operating the appliance
CAUTION! Do not obstruct the distillate gaseous phase flow! Risk of
accidents!
Place the charge in the kettle to distil the liquids. The charge should not exceed
70% of the appliance capacity.
If distilling from a solid or liquid material charge, it must be placed in the
filtering bag (10), safely away from the heated surface. Place the pre-assembled