Toto TET1LB Manual De Instrucciones Y Del Propietario página 8

Idiomas disponibles

Idiomas disponibles

4. Prior to inserting the Flush Valve tailpiece into the
control stop, make sure that the o-ring is in the
groove at the end of the tailpiece, the locking nut
and the snap ring are located as shown.
5. Connect the Flush Valve with the control stop and
the vacuum breaker tube. Exercise care not to
damage the o-ring when inserting the tailpiece
into the control stop. If lubrication is needed,
wetting the o-ring with water is sufficient.
6. Align the Flush Valve and securely tighten fixture
spud nut, vacuum breaker tube nut and locking
nut with a wrench.
7. Connect the battery cable with that of the
controller and set the battery at the proper
position.
NOTE: It will take 5 minutes after connecting
the battery for the electronics to
initialize.
After approximately 30 seconds, the
sensor LED will flash in 4 second
intervals until the initialization
completes.
8. Connect the cables of the solenoid
valve and generator with those of
controller.
INSTALLATION PROCEDURE
- 8 -
Locking nut
Tube nut
Spud nut
Battery
Connection cable
Connection cable
(solenoid)
Control stop
Snap ring
O-ring
Connection cable
(generator)
loading

Este manual también es adecuado para:

Tet1lbxTet6lbTet1ubTet1ubxTet6ubTet1gb ... Mostrar todo