LG RESU10H Prime Manual De Instalación página 7

Ocultar thumbs Ver también para RESU10H Prime:
Idiomas disponibles

Idiomas disponibles

3.1.5
Clearance
the proper ventilation and installer convenience.
Ceiling
500 mm
(20")
300 mm
300 mm
(12")
(12")
Floor
<Standing type>
3.1.6
Tools & Safety Gear Required
Tools
The following tools are required to install the battery pack :
Precision screwdriver
M5 torque wrench
Drill
(min. diameter 10 mm, 0.4")
Sealant gun
** For Australia only, required part is Cobalt Solar Custom Gland, part number
CSE-CHG-3/4NPT-H3-5.5-1B (pack of 2). Available from your RESU distributor.
Safety Gear for Personal Protection
It is required to wear the following safety gears when handling the battery pack.
Insulated gloves
3.1.7
Appearance and Dimensions
Appearance
Proper handling and care are recommended as disassembly, change of color,
battery pack.
Pack appearance and dimensions
817 mm
(32.2")
504 mm
295 mm
(19.8")
(11.6")
7
Ceiling
500 mm
(20")
300 mm
(12")
Floor
<Wall Mounting type>
Inclinometer
Pencil or marker
Tape measure
Gland**
Safety goggles
Safety shoes
Color and materials
- Battery Module front/rear case:
metallic gray, steel
- Battery Control Unit cover &
Module Connect Plate: metallic gray,
aluminum
- LED cover: black, plastic
3.1.8
System Clearance
pack and inverter should be in accordance with the installation guide manual of the inverter.
NOTE
An external DC isolator may be installed within the clearance zone. Minimum clearances
may be greater according to local regulations.
300 mm
(12")
500mm
300 mm
(12")
300mm
300mm
(12")
(12")
<Standing type>
3.1.9
Installing the Battery Pack
3.1.9.1 Standing Type
CAUTION
power cable to the battery pack.
Install the battery pack through the following steps:
S t a
n d
in g
T y
Wall
p e
Front
Rear
Ceiling
500mm
(20")
(20")
300mm
300mm
(12")
(12")
Inverter
Inverter
Floor
Floor
1. Place the Drill template to the wall
Area1
Area2
Area1
Area2
Ex) If min. clearance is 200mm,
Ex) If min. clearance is 200 mm,
203 mm
Ok
OK
203mm
305 mm
OK
Ok
305mm
2. Place a spacer to the position marked
Front
Front
MODULE CONNECT
LATE 1
Wall
direction
Wall direction
Ceiling
500mm
500mm
(20")
(20")
300mm
300mm
(12")
(12")
Inverter
Inverter
300mm
300mm
(12")
(12")
300mm
(12")
Floor
<Wall Mounting type>
where the battery pack will be
installed. After that, drill holes on the
position marked on the Drill template.
* Recommended fastener count:
1(Area1)/1(Area2)
* Recommended fastener diameter/
length: 10mm/40mm Min.
* Fastener separation should observe
the regional building code.
* Check "Standing Type" on the
middle side of Drill Template
before drilling.
on the Drill template. After that, place
the Module connect plate in contact
with the Spacer and align center lines.
* Pay attention to the direction of
the Spacer. Refer to left image for
correct orientation.
*
* Be careful not to damage the
aluminum foil attached on the
bottom of Module connect plate
during handling.
loading