LG RESU10H Prime Manual De Instalación página 22

Ocultar thumbs Ver también para RESU10H Prime:
Idiomas disponibles

Idiomas disponibles

6.1.2
Contact Information
for use and may pose a danger to people or property. If the battery pack seems to be damaged,
contact LG Energy Solution regional contact point. Use the contacts below for technical
assistance. These phone numbers are available only during business hours on weekdays.
29, Gwahaksaneop-3-ro, Oksan-myeon, Heungdeok-gu,
Address
Cheongju-si , Chungcheongbuk-do, South Korea
Regions
Email
Address
19481 San Jose Ave City of Industry, CA 91748, U.S.A
US
Telephone
+1 888 375 8044
Email
E-Service Haberkorn GmbH, Stolberger Str. 25, 06493
Address
Harzgerode, Germany
Europe
Telephone
+49 (0) 6196 5719 660
Email
Address
Unit 12, 35 Dunlop Road, Mulgrave VIC 3170, Australia
Australia
Telephone
+61 1300 178 064
Email
7. Appendix
7.1 Connection in RESU10H Prime parallel battery system
CAUTION
Parallel battery system can only be applied between batteries of same energy
(2 * 10H, 2 * 16H, etc)
7.1.1
Setting for communication termination resistor
Section C
Section B
Section A
When you install the pack as primary, Turn ON the DIP switch for communication termination
resistor.
When you install the pack as secondary, Turn OFF the DIP switch for communication
termination resistor.
(already have)
(already have)
Inverter
Inverter
Terminating
Terminating
resister ON
resister ON
Primary
Primary
Pack
Pack
(already have)
(already have)
Inverter
Inverter
Terminating
Terminating
resister ON
resister ON
Primary Pack
Primary Pack
(already have)
(already have)
Inverter
Inverter
Terminating
Terminating
Secondary
resister OFF
resister ON
Primary Pack
Pack
Position:
Position:
Last side
Middle side
Last side means that it is connected one communication pair (from Secondary pack to Primary
pack)
"In Case 2-2, communication cable is connected by a daisy chain. Communication line from
the inverter should be connected to the secondary battery pack. The additional communication
line is connected from the secondary battery pack to the primary battery pack in a daisy chain
normally.
Section D
Section E
1. Case 1 : When installing one battery
pack, Turn ON the DIP switch for
communication termination resistor.
(It is ON when switches are lowered.)
2. Case 2-1 : When installing two
battery packs, and inverter has two
communication ports separately for
each battery pack, Turn ON all of
the DIP switches for communication
termination resistor of both packs.
3. Case 2-2 : When you install the
two battery packs and inverter
has only one communication port
for both battery packs, install the
secondary pack with the termination
side. Install the primary pack with
the termination resistor turned on
in the last side. Middle side means
that it is connected two number of
communication pairs, (1
st
: from
inverter to Secondary pack, 2
: from
nd
Secondary pack to Primary pack),
22