PRODUCT DESCRIPTION
CAUTION!
Introduction of prohibited media can cause damage to the pump
chamber.
• Never introduce solid materials, fibres, tar, sand, cement, ash,
coarse paper, paper towels, cardboard, rubble, rubbish, slaughter-
ing waste, grease or oils.
• If greasy sewage occurs, a grease trap must be provided.
• Improper use and overloading leads to damage to the pump
chamber.
• The maximum possible inflow must always be lower than the vol-
ume flow of the pump installed at the relevant duty point.
The following media may not be introduced:
• Sewage from drainage objects that are located above the back-
flow level and can be drained by natural fall (in accordance with EN
12056-1)
• Explosive and harmful media such as solid materials, rubble, ash,
rubbish, glass, sand/grit, plaster, cement, lime, mortar, fibres, tex-
tiles, paper towels, nappies, cardboard, coarse paper, synthetic resin,
tar, kitchen waste, grease, oils, waste from slaughtering, carcass
disposal and keeping of animals (manure...)
• Toxic, aggressive and corrosive media such as heavy metals, bioc-
ides, pesticides, acids, alkalis, salts, cleaning agents, disinfectant,
washing-up liquid and detergent in excess quantities and any media
that form a disproportionate amount of foam, swimming pool water
(in Germany in accordance with DIN 1986-3).
3.3. Set-up
Fig. 1: Overview
1
Pump chamber
2
Discharge pipe
3
Non-return ball valve
4
Surface coupling
5
Shut-off valve
6
Pressure connection
7
Lifting equipment (chain)
8
Cross member
The Wilo-Port 800 is a pump chamber with strong finning for verti-
cal concealed floor installation outside buildings.
The pump chamber has three inlet connections and a connection
port for venting and cable ducts. As standard, the pump chamber
is supplied with internal pipework including a non-return valve for
connection of a macerator pump.
For use as a pumping station, additional accessories are required.
3.4. Function description
The pump chamber works fully automatically in conjunction with
a submersible pump and level control. The accumulated sewage
is fed to the pump chamber using the inlet connection (3), and is
initially collected. When the collected sewage reaches the switch-
on level, the submersible pump switches on. The submersible pump
pumps the sewage through the discharge pipe and the pressure con-
nection into the onsite pressurised discharge pipe. The water level
in the pump chamber falls. The control switches off the submersible
pump again after a set time or when the switch-off level is reached
(depending on the signal transmitter used).
Installation and operating instructions Wilo-Port 800
9
Inlet connection
10 Venting/cable ducts
11 Pump
12 Level control
13 Eyes for lifting equipment
14 Hook for attachment of chain
15 Pump chamber cover
Fig. 1
14
10
7
9
2
9
3
English
15
13
1
5
6
4
8
11
12
37