Gas installation

DANGER
Risk of explosion in case of gas leakage due to improper instal-
lation! Only authorised installation companies (VIU) under con-
tract to the gas supply companies (GVU) are permitted.
 The installation companies authorised for installing or modify-
ing gas plants must provide the following details to the gas
supply company before starting installation work:
– Type and scope of the proposed plant.
– Proposed construction measures.
 The contracted installation company shall confirm with the
gas supply company that there will be adequate gas supply to
the plant.
 Gas supply pipe requirements:
– The pipes should be short and straight, as far as possible.
– It should have a nominal width greater than the nominal width
of the burner fittings.
– It should have corrosion protection.
 For pipes inside the building and in the open, it is recommend-
ed to do a preliminary and main test with air or inert gas (not
oxygen):
– Preliminary testing: Without fittings, with an excess pressure
of 0.1 MPa.
– Main testing: Entire pipe plant from the main cock to the stop-
valve at the burner with closed solenoid valves and an oper-
ating pressure of 1.1 times and a minimum excess pressure
of 0.005 MPa (50 mbar).
Plant type:
Certification:
The plant has been properly installed by
(Name, Address):
Signature/ Date
– Apply a coat of foaming agent at the joints; ensure that the
Risk of explosion in case of gas leakage! Do not use leaky pipes.
 Get the start up or commissioning testing done by an author-
 Rinse the firmly installed water pipes at the installation site.
 Establish electrical connections according to the technical
 Inspect the plant and find out the answers to the following
– Is the entire high pressure unit connected properly?
– Are all joints leak-proof?
– Is the decalcification unit ready for operation?
– Is there adequate water supply and is the water temperature
– Is the rotating direction of the burner motor (see direction ar-
– Are the temperature settings on the thermostats "hot water"
– Are the overflow pipes for the swimmer tank and the safety
 Release safety and controlling mechanisms (safety tempera-
Installation certification / Startup testing
Manufact. no.:
Start-up on:
Signature of the approved monitoring agency/ date
17
-
EN
foaming agent is a non-corrosive one.
DANGER
Measures to be taken before start-up
ised agent according to the national requirements of the
country of installation.
data or details on the type plate.
questions:
within permissible limits?
row on the casing) OK?
and "steam stage" OK?
valve "high pressure outlet" connected properly?
ture stop, exhaust temperature stop).