INSTALLATION CHECKLIST

Is the Ice Machine level?
Has all of the internal packing been removed?
Have all of the electrical and water connections been
made?
Has the supply voltage been tested and checked
against the rating on the nameplate?
Is there proper clearance around the ice machine for
air circulation?
Is the ice machine grounded and polarity correct?
Has the ice machine been installed where ambient
temperatures will remain in the range of 50° - 100°F
(10° - 38°C)?
Has the ice machine been installed where the
incoming water temperature will remain in the range
of 40° - 90°F (4° - 32°C)?
Is the ice machine drain line routed to an open site
drain?
Are all electrical leads free from contact with
refrigeration lines and moving equipment?
Has the owner/operator been instructed regarding
maintenance and the use of Manitowoc Descaler and
Sanitizer?
Has the warranty registration information been
completed online at
www.manitowocice.com/Service/Warranty#Warranty-
Registration?
Has the ice machine and bin been sanitized?
When installed is the drain pump functioning correctly
energizes, de-energizes and safety switch stops the ice
machine?
GFCI Required - Is it a breaker type and not a
receptacle type?
Is the ice machine plugged into a properly grounded,
polarized receptacle?
Have the water and drain connections been examined
for leaks?
Has the ice machine been cleaned and sanitized?
NOTE: If air temperature is less than 60°F (15°C), water
temperature must be equal to or greater than 50°F (10°C).