Install The Hood; Prepare The Hood For Wiring Connection And Blower Installation - Best HBC1 Serie Instrucciones De Instalación, Uso Y Cuidado

Ocultar thumbs Ver también para HBC1 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALL THE HOOD

At least three installers are recommended
because of the large size and weight of this
range hood .
1. Adjust height of the telescoping support frame to ensure
a tight fit between the hood and finished ceiling. The
telescoping support frame height must be the same as the
wood support height.
2. Lift range hood into the ceiling opening.
3. Secure each suport frame to the wooden hood support
frame using 10 # 8 x 1-3/8" screws provided.See FIG. 5.
4. Connect ductwork. Duct tape all joints to ensure an air tight
seal.
5. Make all needed electrical connections. See WIRING
section.
PREPARE THE HOOD FOR WIRING
CONNECTION AND BLOWER
INSTALLATION
1. Push in lock tabs (2) on the ends of perimeter panel. See
FIG. 6.
2. Open the panel and remove the mesh filters. See FIG. 7.
3. To ease access for blower installation, remove the central
panel by unscrewing the 3/16 x ¼" screws. See FIG. 7.
Re-install the aluminum mesh filters and
central panel as needed (See FIG . 7) .
Make sure lock tabs are back in place once
installation is done (See FIG . 6) .
7
CAUTION
CAUTION
2
4
x
wood
frame
HD1419
HD1418
(10)
#8
1-3/8"
x
screws
FIG. 5
FIG. 6
FIG. 7
Tabla de contenido
loading

Este manual también es adecuado para:

Hbc143Hbc163

Tabla de contenido