UNITS INSTALLATION
10.1.2. AVAILABLE CONFIGURATION
Four different configuration are available for outdoor unit only
changing the panels and fan position.
NOTE:
-
Keep in mind that fan unit weight is aprox 30Kg, the unit
as well as relevant equipment covered with the vinyl cover
during installation work.
Air inlet modification
■
To change air inlet is only necessary to interchange the
-
indicated panels position. Both panels us screws to be fixed to
unit chasis.
To change air outlet is necessary to interchange panels too.
-
Fan outlet panel is attached to fan structure, which must be
mounted as follow
Change Panel
All manuals and user guides at all-guides.com
10.1.3. INSTALLATION PLACE PROVISION
Concrete Foundation
■
1. Foundation could be on flat and is recommended be
100-300mm higher than ground level.
2. Install a drainage around foundation for smooth drain
3. When installing the outdoor unit fix the unit by anchor bolts of
M10
4. When installing the unit on a roof or a veranda, drain water
sometimes turns to ice on a cold morning. Therefore, avoid
draining in an area that people often use because it is
slippery.
Nº
Change Panel
Suspended unit
■
1. Suspend the unit as the drawing indicates.
2. Ensure that ceiling can resist the Outdoor unit weight
indicated in specification label plate
A
Description
Outdoor Unit
Cut this portion of bolt If not, it's difficult
to remove Service Cover
Mortar Hole (Ø100xDepth 150)
Anchor Bolt M10
Drainage (Wide 100xDepth 150)
Drainage
Vibration-proof rubber
Sling Bolt
Suspension Bracket
PMGB0126A rev.2 - 11/2006
B
Mark
Dimension
Model
5HP
10HP
A
1265
2100
(mm)
B
835
870
(mm)
13