EN
ASSEMBLY
1
Remove the locking board (C) and two bolts (B) at the front end of the main frame and
dispose of them as they are no longer required in the following installation. Mount the
upper support (44) in the direction of the arrow as shown in the illustration until it is
near the main frame (1). One person holds the upper support (44) and a second person
checks the connection cables (A1-A1) after the connection is made. The clamp is
inserted into the large metal hole on the main frame (1) to avoid overloading the signal
line. As shown in the figure, the upper support (44) is fixed in the main frame (1) and is
then pre-locked.
43