Operation; Prior To Start-Up - HEROSE 0651 Serie Instrucciones De Servicio

Llave esférica inversora
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
6

Operation

6.1

Prior to start-up

Check the following points prior to start-up:
All mounting and installation work are completed.
The safety guards are in place.
Compare the material, pressure, temperature and installation position with the layout plan for
the pipework system.
Dirt and residues have been removed from the pipeline and diverter valve in order to prevent
leaks.
6.2
Lever position
Operating instructions
herose.com
21