5
Assembly
5.1
Installation position
Attention must be paid to the direction of flow.
The installation position is arbitrary.
The preferred installation position should be with the stem horizontal.
5.2
Fitting Notice
Use suitable tools.
Clean tools before fitting
Use suitable transport and lifting equipment for the mounting.
Open the packaging only directly before the mounting. Free of oil and grease for oxygen (O
Diverter valves for oxygen are permanently marked with "O
Take note of the HEROSE information sheet "O2 instructions".
Only install the diverter valve if the maximum working pressure and operating conditions of the
plant correspond to the marking on the diverter valve.
Remove protective caps or covers before mounting.
Inspect the diverter valve for dirt and damage.
DO NOT install damaged or dirty diverter valves.
Remove dirt and residues from the pipeline and diverter valve in order to prevent leaks.
Avoid damaging the connections.
The sealing surfaces must remain clean and intact.
Seal the diverter valve with suitable seals.
No sealant (sealing tape, liquid sealing tape) may enter the diverter valve.
Respect the suitability for use with O
Connect pipelines in a force-free and torque-free manner.
Stress-free mounting.
In order to ensure trouble-free operation, no impermissible static, thermal or dynamic stresses
may be transmitted to the diverter valve. Observe reaction forces.
Temperature-dependent changes in length in the pipework system must be compensated with
expansion joints.
Fasten the diverter valve with the existing threads in the body.
The diverter valve must be protected against dirt and damage during construction work.
Check the leak-tightness.
Operating instructions
.
2
herose.com
".
2
)
2
19