Monthly Maintenance; External Maintenance - Amann Girrbach Ceramill Motion 3 Modo De Empleo

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 127
▷ Pull off the cap.
Fig. 25
▷ Blow out the holes from the inside of the cap
using a steam cleaner.
CAUTION:
The cap heats up!
▷ Apply a coat of grease to the C/L pipes.
▷ Clean the seat of the cap on the spindle.
▷ Mount the spindle cap again with the screw at
the right-hand side. Pay attention to the correct
connection of the C/L pipes.
Maintenance unit
▷ Visually check the service unit for:
▪ Visible particles, debris or particulate matter
within the acrylic glass (signs for contami-
nated compressed air)
▪ Amber discolouration of the filter element
(sign of oil in the compressed air)
▪ Water in the filter (sign of water in the com-
pressed air)
Once any of the listed impairments is given:
▷ Correct the problem with the compressed air.
▷ Replace the complete service unit.
C L E A N I N G A N D M A I N T E N A N C E
8.1.4

Monthly maintenance

Checking the zero point
It is recommended to check the zero point once
every month. We recommend the auto-calibration
of the milling machine for this purpose.
▷ On the display of the milling machine, select
Maintenance > Calibrate machine
Spindle
The spindle must be in the starting position.
▷ Manually turn the shaft of the spindle through
(at least ten times).
Fig. 26 Rotating the spindle
8.1.5

External maintenance

External maintenance is necessary after 1000
operating hours. The milling machine software will
inform you appropriately.
E N
.
61
Tabla de contenido
loading

Este manual también es adecuado para:

Ceramill coolstream

Tabla de contenido