Midwest Feline Nuvo 138E-BK Instrucciones De Armado página 2

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

assembly InstructIons
***NOTE: Must do two pre-assemblies before doing large structure assembly.
Pre-Assembly
Attach the Short Sisal-Wrapped Tube (C) to the Square
1.
Bolstered Perch (G) using one of the Short Dual Thread
Screw with Even Threads (I). Screw the Dual Thread
Screw into the Short Tube until bottom threads disappear
and only top are visible. Then take Square Bolstered
Perch and tighten on tube. NOTE: Turn Square Perch
clockwise by hand to tighten and secure.
2.
Attach the Small Middle Platform (K) to one of the Long
Sisal-Wrapped Tubes (C) using one of the Short Dual
Thread Screw with Even Threads (I). Screw the Dual
Thread Screw into the Tube first, tighten screw until
bottom threads disappear, and then attach the platform.
NOTE: Tube must be attached to corner closest to ball.
Turn platform by hand to tighten and secure.
Large Structure Assembly:
Attach the other Long Tube (C) (not one with Platform
3.
attached) to the Base (A), using one of the Long
Hardware Screws with Washers (B). Insert the Screw
and Washer from bottom of Base; tighten with Allen
Wrench (M).
Short Dual Thread Screw
with Even Threads
Corner Closest to Ball
Tabla de contenido
loading

Tabla de contenido