Cra" "Final Crater Filler; Soft Start; Burnback; Double Level - Cebora SOUND MIG 3540/TS SPEED STAR Manual De Instrucciones

Soldadora de hilo
Ocultar thumbs Ver también para SOUND MIG 3540/TS SPEED STAR:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 70
Start current
Starting current time
Slope time
The welding process starts with the "Start Current".The
time duration of this fi rst current is controlled by the "start-
ing current time". After this stage the current connects to
the welding current according to "Slope Time".
7.1.10"CRA" "Final crater fi ller".
(only in synergic MIG 2T or 4T processes).
OFF (preset)
ON
The following adjustments are available when "ON" is se-
lected:
Slope time
Crater Current
Crater Current Time

7.1.11 "Soft Start" .

(only in MIG/MAG processes)
It is the wire speed, expressed as a percentage of the
speed set for the welding, before the wire touches the
workpiece.
Soft Start

7.1.12 "Burnback".

(only in MIG/MAG processes)
Serves to adjust the length of the wire leaving the contact
tip after welding.
Reg Burnback
7.1.13 "Double Level" (optiona) (only in synergic MIG/
MAG processes).
This type of welding varies the intensity between two lev-
els
.
Before setting the double level welding, it is necessary to
make a short bead to determine the wire speed and the
current to obtain the penetration and the bead width clos-
est to the type of welding to be made.
The wire feed speed is thus determined (and the corre-
sponding current); the meters per minute that will be set
will be alternatively added to and subtracted from this
value.
Before start working you should not forget that for a cor-
rect bead, the minimum overlapping between two "mesh-
es" must be 50%.
OFF (preset)
ON.
The following adjustments are available when "ON" is se-
lected:
MIN
MAX
DEF.
10%
200%
135%
0.1 s
10 s
0.5 s
0.1 s
10 s
0.5 s
MIN
MAX
DEF.
0.1 s
10 s
0.5 s
10%
200%
60%
0.1 s
10 s
0.5 s
MIN
MAX
DEF.
1%
100%
Auto.
MIN
MAX
DEF.
4 ms
250 ms
Auto.
Frequency

Pulse step

Duty cycle
Arc correction

7.1.13.1 "Frequency" of double level.

The Herz frequency is the number of periods per second.
Period means the speed alternating from the higher to
the lower values.
The lower value, that does not penetrate, is used by the
operator to change from one mesh to the next one; the
higher speed, corresponding to the maximum current, is
the penetrating speed; the operator will stop to make the
mesh.
7.1.13.2 "Pulse Step": it is the amplitude of the speed
change in/min.
The speed change determines the sum and the the sub-
traction of m/min from the reference speed described
above. Parameters being the same, when the number in-
creases the mesh is wider and penetration is deeper.

7.1.13.3 "Duty cycle": double level time.

Expressed as a percentage, this is the higher speed/cur-
rent time as compared to period duration. Parameters be-
ing the same, it determines the mesh diameter and there-
fore the penetration.

7.1.13.4 "Arc Length Cor".

Sets arc length of the higher speed/current.
Warning: make sure that the arc length is the same for
both currents.
7.1.14 "Prefl ow".
(In all processes except MMA).
Pre Gas
7.1.15 "Postfl ow".
(In all processes except MMA).
Postfl ow

7.1.16 "Speed Corr".

(only in MIG HD processes).
Allows the percentage correction of the wire speed as
MIN
MAX
PRED.
0.1 Hz
5 Hz
1.5 Hz
0.1 m
3 m
1 m
25%
75%
50%
-9.9
9.9
0
MIN
MAX
DEF.
0 s
10 s
0.1 s
MIN
MAX
DEF.
0 s
10 s
3 s
29
Tabla de contenido
loading

Tabla de contenido