6 .5
Configuring a panel for operating a bow thrust-
er or a stern thruster
Carry out the following actions on EACH panel in the order indi-
cated:
N.B. The panel must be in the OFF position (if the panel is NOT in the
OFF position, first press the On / Off button once to switch the panel
to the OFF position.
1
10 seconds
1 Place the panel in configuration mode
• Press and hold the On / Off button for 10 seconds.
2
2 Push the joystick to the left.
5
1 x
BLUE
5 Configuring for a bow thruster: Push the joystick to the left once.
Configuring for a stern thruster: Push the joystick to the right once.
With a bow and stern thruster panel, together at the same helm
station, the helm station number entered must be the same .
30
020805.04
dididididididid ( . . . . . . )
6
seconds
3
didahdi ( . − . )
3 Keep the joystick in this position and press
the On/Off button.
RED
n
ote
OR
ON/OFF
BPPPA
4
seconds
During the first 6 seconds, the buzzer will continuously signal a didi-
didididi ..... (. . . .). Keep pressing the On / Off button. After 10 seconds
the buzzer sounds the signal dididididah (. . . - -). Now the panel is in
configuration mode.
4
4 Release the joystick after the signal didahdi
( . – . ) is given.
6
1 x
6 Press the On/Off button once to confirm
the setting.
Settings are retained even if the supply voltage is switched
vetus® Installation instructions BOW PRO Series Thrusters: BOWA0574
ON/OFF
BPPJA
dididididah ( . . . . − )
Con guration mode
1 x
n
ote
off!