Installation; Typical Installations - red lion RL-SWJ Serie Manual Del Propietário

Ocultar thumbs Ver también para RL-SWJ Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Risk of damage to pump or other equipment.
Periodically inspect pump and system components. Regularly check piping for weakness or wear, making certain that all connec-
tions are secure.
Schedule and perform routine maintenance as required. Refer to

INSTALLATION

Typical Installations

The following drawings illustrate how the system should be arranged in the plumbing system.
Shallow Well
Tank
Relief Valve
Service Line
Drain
Suction Pipe
Vent Pipe
Well Seal
Well
Foot Valve
Shallow Well Tank Mounted System
Service Line
Priming Plug
Suction Pipe
Vent Pipe
Pressure
Gauge Port
Well Seal
(1/8" NPT)
Well
Foot Valve
Relief Valve
Priming Plug
Drain Plug
Pressure gauge port (1/8" NPT)
Shutoff Valve
Union Coupling (2 required)
Drain Plug
Tank
Drain
"Maintenance" on page
7.
Shallow Well Inline Tank
Service Line
Priming Plug
Suction Pipe
Vent Pipe
Well Seal
Well
Pressure Gauge Port (1/8" NPT)
Foot Valve
Shallow Well Inline Check Valve
Tank
Relief valve
Service line
Drain
Inline check valve
Suction Pipe
Vent Pipe
Well Seal
Well
1-1/4"
Galvanized Pipe
Well Point
INSTALLATION
Typical Installations
Tank
Relief Valve
Drain Plug
Priming plug
Drain plug
Pressure gauge port (1/8" NPT)
1-1/4" PVC Elbow
3
Tabla de contenido
loading

Este manual también es adecuado para:

Rl-swj50Rl-swj75Rl-swj100970805029708070197081001

Tabla de contenido