DESCRIPTION OF DRAWING PAGES
Below enumeration refers to the device elements depicted on the drawing pages of this manual.
1. Quick-release chuck
2. Ring of the quick release chuck
3. Torque adjustment ring
4. Gear switch
5. Direction selector switch
6. Battery lock button
7. Battery
8. Switch
9. Battery level indicator (LED)
10. Lighting
11. LED diodes
12. Charging station
13. Charger
* Differences may appear between the product and drawing.
MEANING OF SYMBOLS
CAUTION
WARNING
ASSEMBLY / SETTINGS
INFORMATION
EQUIPMENT AND ACCESSORIES
1. Battery
2. Charger
3. Charging station
4. Driver bit
5. Soft bag
REMOVING AND INSERTING THE BATTERY
Set the direction selector switch (5) in middle position.
Push battery lock buttons (6) and slide out the battery (7) (fig. A).
Insert charged battery (7) into the handle holder, you should hear when the battery lock buttons (6)
snap.
BATTERY CHARGING
Drill is supplied with partially charged battery. The battery should be charged in ambient temperature
between 4
0
C and 40
0
C. New battery, or one that has not been used for a long time, will reach full efficiency
after approximately 3 to 5 charge/discharge cycles.
Remove the battery (7) from the drill (fig. A).
Connect the charging station (12) to the charger (13).
Connect the charger (13) to mains socket (230 V AC).
Put the battery (7) inside the charging station (12) (fig. B).
Once the battery has been placed in the charging station, LED diodes (11) will light up on the charging
station (12), different configurations are possible (see below).
Green diode on – indicates voltage on the connector.
Green and red diodes on simultaneously – (when the battery is placed in the charging station) indicate
that the charging is in progress.
- 2 pcs
- 1 pce
- 1 pce
- 1 pce
- 1 pce
PREPARATION FOR OPERATION
17