Westinghouse Leon Manual Del Usuario página 10

Tabla de contenido
8
Slide down rod ball over the lead wires and down the down rod. Re-install cross
pin into down rod and slide down rod ball up until cross pin fits firmly into ball.
Tighten set screws in ball.
Deslice la bola de la varilla vertical sobre los cables conductores y la varilla vertical. Vuelva
a instalar el pasador transversal en la varilla vertical y deslice hacia arriba la bola de la
varilla vertical hasta que el pasador calce firmemente dentro de la bola. Apriete el tornillo
de fijación en la bola.
DOWN ROD INSTALLATION
INSTALACION DE LA VARILLA VERTICAL
9
5
3
Loosen set screws in down rod coupling (1). Insert down rod into down rod coupling.
Make sure to align hole in down rod with the hole in coupling. Install yoke cross pin (2)
through yoke and down rod. Insert clamp pin (3) into cross pin until it snaps into place.
Tighten set screws (4) in coupling. Slide coupling cover (5) over coupling.
Afloje los tornillos de fijación en el acoplamiento de la varilla vertical (1). Inserte la
varilla vertical en el acoplamiento de la varilla vertical. Asegúrese de que el agujero de
la varilla vertical y el del acoplamiento estén alineados. Instale el pasador transversal de
la varilla vertical (2) pasándolo por el acoplamiento y la varilla vertical. Inserte el pasa-
dor de fijación (3) en el pasador transversal hasta que escuche un chasquido que
indique que está en la posición adecuada. Ajuste los tornillos de fijación (4) en el aco-
plamiento. Deslice la tapa del acoplamiento (5) sobre el acoplamiento.
10
ETL-ES-Leon-WH20
4
1 2
Tabla de contenido
loading

Este manual también es adecuado para:

Etl-es-leon-wh20

Tabla de contenido