JBM 50812 Manual De Instrucciones página 12

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 3
3. Putt he frame posts (20) in the upright po-
sition. Slide each base support (24) under the
frame posts (20) and place the bottom frame
support (23) between them. [FIGURE 2]
[FIGURE 2]
5. Align the holes on the upper beam (1) with
the holes in the top of frame posts (20) using
the bolts (6), washers (7) and nuts (8). Then
attach the Jack head plate (11) using bolt (9),
washers (7) and nuts (8). [FIGURE 4]
[FIGURE 4]
[FIGURE 6]
4. Attach the base side supports (22) to the
frame posts and base support using the bolts
(21), washers (7), and nuts (8).
[FIGURE 3]
6. Hang the Jack base plate (15) using the
springs (5). Attach the coping (14) on the Jack
base plate using bolts (13), washers (16) and
nuts (17). Then put the bottle Jack (10) be-
tween the Jack base plate and upper beams.
[FIGURE 5]
7. Slide the support pins (19) into the holes in the frame posts.
Angle the press table (18) so the rails of the press table straddle
the frame posts, then lower into place down the frame posts so the
press table rests on the support pins. Then put the Arbor Plate (25)
on the press table. [FIGURE 6]
· 12 ·
[FIGURE 3]
[FIGURE 5]
REF. 50812
loading