Installation Instructions – CGTSURF24
Floating Long Rail
Figure 12.
B.
Instructions for Wall Mount, Horizontal
Orientation
B1. Follow steps A1 - A4 above to assemble box.
B2. Locate box on the wall and mark mounting holes.
Note 1: The long rail with the tether anchors installed must
be closest to the floor. (Figure 13.)
Note 2: It is recommended to mount the box such that
the supply conductor junction box is located at one
end of the box. This will ensure there is enough
free space inside the box for excess flexible metal
conduit. (Figure 13.)
B3. Attach box to wall using appropriate hardware (not
included) to secure both short rails and the bottom
long rail with the tether anchors installed to the
surface. Ensure the box remains square when
mounting. The spacing of the mounting slots is 16
inches center-to-center. (Figure 13.)
Long Rail With Tether
Anchors Must Be Closest
To Floor And Secured To
The Wall
Figure 13.
4
EATON
IB519118EN
Supply Conductor
Junction Box
Installation instructions
B4. Unscrew and remove the top long rail, as well as
the L- brackets, and retain for reuse. (Figure 14.)
Figure 14.
B5. Hang the fixture from the 2 tethers by inserting
each toggle through a hole on the grid clip tabs on
each side of the fixture. (Figures 15 and 16.)
Figure 15.
Figure 16.
B6. Follow steps A9 – A11 above to complete the
installation of the fixture.