Assembly And Operation; Applications; Prior To Operation - Hitachi D 10VH Manual De Instrucciones

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

English

ASSEMBLY AND OPERATION

APPLICATIONS

Boring holes in metal, wood and plastic.

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms to the power source requirements
specified on the product nameplate.
2. Power switch
Ensure that the switch is in the OFF position. If the plug is connected to a receptacle
while the switch is in the ON position, the power tool will start operating immediately
and can cause serious injury.
3. Extension cord
When the work area is far away from the power source, use an extension cord of
sufficient thickness and rated capacity. The extension cord should be kept as short as
practicable.
10
Checke, us-0.0046 Tw75 336.53 Tm0.0016202and rateEnsure th5(Powe(onnecte-0.0046 Tnamly loosD- ac0.00snected to,necte-0.0046 Tnmustt asr0 a.22d. Con046t0 Tc-0.0007 Twcan cause ser licld t neltacr and oTjmakordpe.)pr2 TDsr0 a.2s.0.0001 Tw(and the298Powe(onnsuposahe ut- -0.0046 Tn th cod, itmaynjury.)overhey)Tj, -sul)Tj0 nsahTj10 0cticable.
Tabla de contenido
loading

Tabla de contenido