Battery Installation And Connection - Tripp-Lite BP240V09 Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Installation

5.6.2 Battery Installation and Connection

The 40 batteries are divided into two groups connected in parallel for use. Each group has has 20 batteries in series (BAT+,
N and BAT-). Install the batteries starting at the bottom of the cabinet and working up one by one (Figures 5-54 and 5-55).
Fuses, 250A (x4)
Battery Breaker
10-20 kVA Connector
25-50 kVA Connector
Layer 4
Layer 3
Layer 2
Layer 1
Figure 5-54: Front Internal View, Models BP240V40L and BP240V40L-NIB
Figure 5-55: Rear Internal View, Models BP240V40L and BP240V40L-NIB
Battery Group 2
Battery Group 1
Positive Battery Group 2
Negative Battery Group 2
Positive Battery Group 1
Negative Battery Group 1
55
Tabla de contenido
loading

Tabla de contenido